当前位置:首页-新闻资讯

工厂光伏屋顶比不可少的知识

发布时间:2024-03-16 发布人:天合·种电 发布来源:http://www.zdnygf.com/

一、工厂光伏屋顶系统的种类

1、 Types of factory photovoltaic roof systems

工厂光伏屋顶有两种主要类型:直接安装和转移安装。在直接安装中,太阳能光伏组件安装在位于建筑物内的屋顶上,以更大程度地利用建筑物的内部空间。从转移安装的角度来看,太阳能光伏组件安装在建筑物外部,例如花园、停车场或其他开放空间,以提高组件的效率。

There are two main types of factory photovoltaic roofs: direct installation and transfer installation. In direct installation, solar photovoltaic modules are installed on the roof inside the building to maximize the utilization of the building's internal space. From the perspective of transfer installation, solar photovoltaic modules are installed outside buildings, such as gardens, parking lots, or other open spaces, to improve the efficiency of the modules.

二、规划安装

2、 Planning installation

在安装工厂光伏屋顶系统之前,有必须要考虑的几个因素,例如设施的面积、形状、建筑物的结构、安装点的坡度、安装和使用权限以及太阳能系统本身的功率和性能。规划完安装工作在开始之前,你需要做的是了解所有因素,以便确保你的工厂光伏屋顶系统对空间的更佳利用。

Before installing the factory photovoltaic rooftop system, there are several factors that must be considered, such as the area and shape of the facility, the structure of the building, the slope of the installation point, installation and usage permissions, and the power and performance of the solar system itself. After planning the installation work, before starting, what you need to do is understand all factors to ensure that your factory's photovoltaic rooftop system makes better use of space.

20221206031006955_01

三、确定安装位置

3、 Determine installation location

确定安装位置是安装工厂光伏屋顶的重要一步。理想的安装位置应满足以下要求:屋顶应尽量坚固、干燥、清洁;太阳能组件应尽量避免被遮挡;太阳能发电系统应位于足够安全的空间中。

Determining the installation location is an important step in installing the factory's photovoltaic roof. The ideal installation location should meet the following requirements: the roof should be as strong, dry, and clean as possible; Solar modules should be avoided as much as possible from being obstructed; The solar power generation system should be located in a sufficiently safe space.

四、安装太阳能组件

4、 Installing solar modules

安装太阳能组件其实很容易,但有一点要注意:电缆应尽量短,且不受阻碍,方便维护和检查。此外,太阳能模组的安装位置应处于安全的距离,且组件的散热机制需保持正常工作。

Installing solar panels is actually quite easy, but one thing to note is that the cables should be as short as possible, unobstructed, and easy to maintain and inspect. In addition, the installation position of the solar module should be at a safe distance, and the cooling mechanism of the components should be maintained in normal operation.

五、安装控制系统

5、 Install control system

安装太阳能控制系统是安装工厂光伏屋顶的后一步,也是重要的步骤。控制系统的主要作用是监控你的太阳能发电系统的整体性能,并实时传输数据至远程服务器,以便远程监控太阳能发电系统的整体性能。

Installing a solar control system is the final and important step in installing the factory's photovoltaic roof. The main function of the control system is to monitor the overall performance of your solar power generation system and transmit real-time data to remote servers for remote monitoring of the overall performance of the solar power generation system.

六、安全技术

6、 Security technology

在安装工厂光伏屋顶时,重要的一点是确保过程中的安全技术,以确保安装现场的安全。太阳能发电系统需在安装前安装好仪表、控制箱和断路器,以及确保安装现场的空气湿度低,温度适中并且维持一个合理的漏电保护系统。

When installing photovoltaic roofs in factories, it is important to ensure safety techniques during the process to ensure the safety of the installation site. The solar power generation system needs to install instruments, control boxes, and circuit breakers before installation, and ensure that the air humidity at the installation site is low, the temperature is moderate, and a reasonable leakage protection system is maintained.

  • TEL:0531-82390078
  • TEL:18805312017
  • MAI:sdzdny001@163.com

扫一扫方便咨询我们

截屏,微信识别二维码

微信号:18805312017